Work / Nexus / Changelog / Day 15
Day 15: Changelog on acaldwell.dev
Document day: Days 12–14 changelog entries ship to production on Cloudflare Workers. The Day 15 Use brief (Console alerts ↔ nexus-tui) waits on a real SOC session.
Natural day 15. The challenge brief is Use: correlate Console alerts with the nexus-tui feed for the same session. That needs a live alert stream and a session worth correlating — same blocker as Day 14’s Use run.
This day is documentation and shipping.
What shipped on the site
The 100 Days log lives at /nexus/changelog — not the blog. Days 12–14 entries (platform state, audit, ai-inference triage prep) are published on acaldwell.dev via npm run build + wrangler deploy.
Old /blog/100-days-of-nexus-* URLs still 301 to the matching changelog slug. STIG compliance posts remain drafted off the blog index until that project exists.
Challenge status (unchanged metrics)
| Item | State |
|---|---|
| Days 1–11 | Done |
| Days 12–13 | Document catch-up |
| Day 14 Use | Open — triage Build prep landed Aug 31 |
| Day 15 Use | Open — needs Day 14 evidence first |
| Deferred Builds | Approvals contract; athena-agents SSE (retire Day 9 bridge) |
Skills 15 · sessions 2 · GT 14 · detection coverage still —.
Then
Either run Day 14 Use for real (SOC baseline + Athena + triage in Console), or pick up a deferred Build (approvals or SSE) before Phase 1 closes at Day 20.