Work / Nexus / Changelog / Day 13
Day 13: Audit — Challenge vs core-nexus
Catch-up Document day: honest map of Days 1–100 against the repo. Phase 1 stops at Day 11 (+32 early). Approvals and athena SSE Builds deferred. Architecture overclaims called out.
Natural day 13 of the challenge. The checklist and git had drifted — platform work landed without day numbers, and a few changelogs overstated readiness. This entry is the audit.
Phase 1 — Foundation
| Days | Status |
|---|---|
| 1–11 | Done (Day 9 via GT→SSE bridge, not prod athena HTTP) |
| 12–13 | Done as Document catch-up (this pair) — original Builds deferred |
| 14–20 | Open (Use/Build/retrospective) |
| Deferred | Typed approvals contract; athena-agents SSE (retire Day 9 bridge) |
Day 4’s stub-Act story is historical. Act executes registered tools in athena-agents now. Day 6’s “SOCAlert = Day 32” claim is stale — Day 11 shipped the map (also checked as Day 32).
Phase 2 — Detection
| Days | Status |
|---|---|
| 21–31 | Not started (SQLi→Suricata, OpenPLC, Modbus Use/share) |
| 32 | Done early (= Day 11 SOCAlert map) |
| 33 | Not started (alert ack API) |
| 34 | Partial — badge rules from Day 6; meaningful “unacked” needs Day 33 |
| 35–40 | Not started |
k8s Wazuh/Suricata manifests exist. That is not the same as Days 14/21/35 Use evidence.
Phases 3–5 — precursors only
No day checkboxes complete. Roughly two dozen days have scaffolding or adjacent work (skill MinIO sync, Console approvals UI, range Athena limits, syft/cosign for platform images, Kyverno signed-image policy, AI-inference keyword “memory” mock, ICS specs). None finish a Phase 3–5 brief inside core-nexus alone.
Prerequisites shifted under several future days:
- Skill/RAG days that say “MinIO only” must mean object store (MinIO lab / R2 prod)
- “Agent overlay on k3d” lives primarily in
nexus-athena; core-nexus has the range shell + Console - Vault-in-this-repo assumptions →
nexus-hashistack - Webtop-era SOC → Console Deployments
Architecture honesty
Highest drift is docs, not the challenge tracker:
docs/architecture/13(and related) present Plan skill load, multi-backend agent LLM, and Chroma/Milvus RAG as current while code still shows Future / mock / external repos- Supply-chain scripts sign platform images; that is not Day 66–70 “Athena agent SBOM/cosign loop” complete
- TUI approvals are display-oriented; write-back is not the Day 58/59 story yet
The challenge file’s empty Phase 3–5 progress logs were the accurate part. The narrative docs need a pass (not this day’s rewrite).
Deferred Builds (do next)
- Approvals —
ApprovalActionmodels, pending-default + Property 8, decision 404/409/502 - SSE from athena-agents — real
/sessions+/events; gate stays on the Day 9 bridge until then
Then
Day 14 (U): use the SOC spine — Athena traffic, real alerts, triage in Console. Until Approvals/SSE land, Agent Feed and the Approvals badge stay limited by upstream honesty.
Tracker metrics (unchanged)
Skills 15 · sessions 2 · GT 14 · detection coverage still —.